The 8,500-square-foot chapel seats 300 and includes a 24-hour mediation space for students, staff and friends of Thomas More. Mass is held at noon on weekdays and 8 p.m. Sundays, except during the summer and holiday breaks.

More than 200 donors contributed to the $4.2 million cost of the free-standing building, which was a longtime dream of many in this campus community.

Klenco Construction of Taylor Mill supervised construction. Klenco’s work with the Diocese of Covington includes construction of the entire campus of the Immaculate Heart of Mary Church and School and the renovation of the Cathedral Basilica of the Assumption.